PR 00295: verschil tussen versies
Geen bewerkingssamenvatting |
Geen bewerkingssamenvatting |
||
Regel 11: | Regel 11: | ||
'''Contact:''' {{External link|resource=Resource Hyperlink 00707|name=Tim van Ooijen|dialog=process-linkwebsite-dialog}} | '''Contact:''' {{External link|resource=Resource Hyperlink 00707|name=Tim van Ooijen|dialog=process-linkwebsite-dialog}} | ||
{{Project config}} | {{Project config}} | ||
{{Project | {{Project | ||
Regel 18: | Regel 17: | ||
|Start date=2017/03/01 | |Start date=2017/03/01 | ||
|End date=2022/12/31 | |End date=2022/12/31 | ||
|Summary=In order to create a new nature area which can be categorized as an intertidal area with low flow dynamics multiple horizontal dykes will be placed in the Westernscheldt near the Baalhoek and Knuitershoek. This project is used as a monitoring program that focuses on the ecological changes, changes in sedimentation and changes in flow velocity. | |Summary=Het project buitendijkse maatregelen heeft als doel een laagdynamisch intergetijdengebied te creëren met een areaal van in totaal 57 hectare. Door het aanleggen van extra strekdammen en het ophogen van de bestaande wordt beoogd om bestaande veenrijke slikken geleidelijk te laten opslibben. Het gebied dat zich tussen de strekdammen bevindt krijgt hierdoor betere omstandigheden voor de vestiging van bodemdieren: de stroomsnelheden nemen af en sediment wordt afgezet. Zo wordt het gebied aantrekkelijker voor foeragerende vogels. Dit project wordt gebruikt als een monitoringprogramma dat zich richt op de ecologische veranderingen, veranderingen in sedimentatie en veranderingen in stroomsnelheid. | ||
|Show summary=Nee | |||
|SummaryEn=In order to create a new nature area which can be categorized as an intertidal area with low flow dynamics multiple horizontal dykes will be placed in the Westernscheldt near the Baalhoek and Knuitershoek. This project is used as a monitoring program that focuses on the ecological changes, changes in sedimentation and changes in flow velocity. | |||
Research type: Field research | Research type: Field research | ||
|Contact person=Gebruiker:Lage0009 | |||
|Contact person= | |Stakeholder=STKH 00061,STKH 00064,STKH 00069,STKH 00070 | ||
|Stakeholder=STKH 00061,STKH 00064,STKH 00069,STKH 00070, | |HZ theme=Water, | ||
|SDG=Leven in het water, | |||
|Show extra=Nee | |Show extra=Nee | ||
|Show navigation tree=Ja | |Show navigation tree=Ja |
Versie van 24 aug 2022 14:08
Within the Westernscheldt there is a need for nature compensation due to the dredging of the Scheldt. The Province of Zealand has decided to add natural value to the Baalhoek and Knuitershoek by creating low flow velocity areas. With the change in velocity, there will also be a change in sedimentation and erosion rates, creating new dynamics in the research area.
The project 'Buitendijkse Maatregelen' will be used as a monitoring program focusing on ecological changes and changes in the hydraulics. The main goal is to be able to supply the right stakeholders with spatial patterns based on morphological information (sediment height). From this information the projectteams can determine weather or not the desired sedimentation velocity is reached or it can make changes to reach this velocity. Within this research project the main questions we are trying to answer are:
- 'What is the sedimentation velocity in the project area and areas surrounding it?'
- 'What processes determine sedimentation velocity within these areas?'
- 'How can the sedimentation velocity be influenced, in case the current velocity does not comply with the desired conditions?'
Research type: field research, desk analysis, lab research
Location: Knuitershoek & Baalhoek, Zeeland
Contact: Tim van Ooijen