|Name=Reimerswaal (NL)
|Name=Reimerswaal
|Start date=2016/10/01
|Start date=2016/10/01
|End date=2020/01/31
|End date=2020/07/31
|Show summary=Ja
|Summary=The Multi-Layer Safety concept looks at the consequences of a possible flooding. This project will specifically address the following question:  What impact does a flood have on our vital infrastructure?The goal of the project is to develop a better integral insight in making the electricity supply network flood resilient. To this end, insight will first be provided into the most vulnerable electricity sets. Subsequently, measures will be derived to increase the robustness.
|Show summary=Nee
|Show navigation tree=Ja
|Show navigation tree=Ja
|Show sub projects=Ja
|Show new page button=Ja
|Show participants=Ja
|Show sub projects=Nee
|Show sources=Ja
|Show participants=Nee
|Show sources=Nee
|Is homepage=Nee
|Show edit button=Nee
|Show VE button=Ja
|Show category label=Nee
|Show title=Ja
}}
}}
{{Project FR PLT additional
{{Project FR PLT additional
|Objective=* Mapping of vital infrastructure (roads, rail, electricity) that submerges during a flood
|Country=The Netherlands
* Inventory of submergence preventive spatial measures - cost / effectiveness - (layer 2)
|Coordinate=51.451682659253, 4.0390957544922
* Adoptable (GIS) tool with submergence preventive measures for flood prone region
|Pilot manager authority=Province of Zeeland
|Target=1 - 22.260 inhabitants
|Objective=The overall goal of this pilot is to change the way policy makers and inhabitants think about adding spatial adaptation measures (layer 2) to flood defence measures (layer 1) to decrease the vulnerability of vital infrastructure.
2 - 2 infrastructure operators
|Flood risk=Sea flooding; very low probability(>1:1000 years), flood return period 1:4000 years (interview with pilot manager, 2019).
|Responsible person=CNTR 00110,Pieter Ton
}}
}}

Huidige versie van 25 aug 2022 om 11:12



}

























Country: The Netherlands
Coordinate 51° 27' 6.06" N, 4° 2' 20.74" E
Pilot manager authority: Province of Zeeland
Objective: The overall goal of this pilot is to change the way policy makers and inhabitants think about adding spatial adaptation measures (layer 2) to flood defence measures (layer 1) to decrease the vulnerability of vital infrastructure.
Flood risk: Sea flooding; very low probability(>1:1000 years), flood return period 1:4000 years (interview with pilot manager, 2019).
Stakeholder(s):