FR PLT PR 00006: verschil tussen versies

Geen bewerkingssamenvatting
Geen bewerkingssamenvatting
 
(57 tussenliggende versies door 8 gebruikers niet weergegeven)
Regel 2: Regel 2:
{{Project FR PLT config}}
{{Project FR PLT config}}
{{Project
{{Project
|Supercontext=PR 00069
|Supercontext=PR 00266
|Project type=FR PLT,  FR WP,  Standaard
|Project type=FR PLT,  FR WP,  Standaard
|Topcontext=PR 00069
|Topcontext=PR 00069
|Name=Flood Proof Electricity Grid Zeeland (NL)
|Name=Flood Proof Electricity Grid Zeeland
|Start date=2016/10/01
|Start date=2016/10/01
|End date=2019/09/30
|End date=2020/07/31
|Summary=- Inventory of requirements for a flood proof electricity grid
|Summary=In this pilot, the province of Zeeland will assess the impact of floods in flood prone areas where a concentration of infrastructures, such as roads, tunnels and rails, can be found. We aim to develop spatial solutions based on the MLS-approach that will include a flood-proof electricity grid that will mitigate the effects of floods (cost-)effectively.
- Flood proof grid spatial planning measures (layer 2)
|Show summary=Nee
- Duplicable spatial measures model for resilient NSR
|Show navigation tree=Ja
electricity grids
|Show new page button=Ja
|Show sub projects=Nee
|Show participants=Nee
|Show sources=Nee
|Is homepage=Nee
|Show edit button=Nee
|Show VE button=Ja
|Show category label=Nee
|Show title=Ja
}}
}}
{{Project FR PLT additional
{{Project FR PLT additional
|Objective=Flood proof electricity grid
|Country=The Netherlands
|Target=1 - 381.182 inhabitants
|Coordinate=51.4989236, 3.6110654
2 - 1 electricity grid operator
|Pilot manager authority=Province of Zeeland
|Responsible person=CNTR 00110
|Objective=* Inventory of requirements for a flood proof electricity grid;
* Flood proof grid spatial planning measures (layer 2), and
* Duplicable spatial measures model for resilient NSR electricity grids
|Flood risk=Sea flooding
}}
}}

Huidige versie van 7 mei 2020 om 13:06



}

























Country: The Netherlands
Coordinate 51° 29' 56.12" N, 3° 36' 39.84" E
Pilot manager authority: Province of Zeeland
Objective:
  • Inventory of requirements for a flood proof electricity grid;
  • Flood proof grid spatial planning measures (layer 2), and
  • Duplicable spatial measures model for resilient NSR electricity grids
Flood risk: Sea flooding
Stakeholder(s):
Bezig met het laden van de kaart...



Onderwerpen