FR PLT PR 00006: verschil tussen versies
Geen bewerkingssamenvatting |
Geen bewerkingssamenvatting |
||
(3 tussenliggende versies door dezelfde gebruiker niet weergegeven) | |||
Regel 1: | Regel 1: | ||
{{Project FR PLT config}} | {{Project FR PLT config}} | ||
{{Project | {{Project | ||
Regel 8: | Regel 7: | ||
|Name=Flood Proof Electricity Grid Zeeland | |Name=Flood Proof Electricity Grid Zeeland | ||
|Start date=2016/10/01 | |Start date=2016/10/01 | ||
|End date=2020/ | |End date=2020/07/31 | ||
|Summary=In this pilot, the province of Zeeland will assess the impact of floods in flood prone areas where a concentration of infrastructures, such as roads, tunnels and rails, can be found. We aim to develop spatial solutions based on the MLS-approach that will include a flood-proof electricity grid that will mitigate the effects of floods (cost-)effectively. | |Summary=In this pilot, the province of Zeeland will assess the impact of floods in flood prone areas where a concentration of infrastructures, such as roads, tunnels and rails, can be found. We aim to develop spatial solutions based on the MLS-approach that will include a flood-proof electricity grid that will mitigate the effects of floods (cost-)effectively. | ||
|Show summary=Nee | |Show summary=Nee | ||
Regel 26: | Regel 25: | ||
|Coordinate=51.4989236, 3.6110654 | |Coordinate=51.4989236, 3.6110654 | ||
|Pilot manager authority=Province of Zeeland | |Pilot manager authority=Province of Zeeland | ||
|Objective= | |Objective=* Inventory of requirements for a flood proof electricity grid; | ||
* Flood proof grid spatial planning measures (layer 2), and | |||
* Duplicable spatial measures model for resilient NSR electricity grids | |||
|Flood risk=Sea flooding | |Flood risk=Sea flooding | ||
}} | }} |