FR PLT PR 00009: verschil tussen versies

Geen bewerkingssamenvatting
Geen bewerkingssamenvatting
 
(3 tussenliggende versies door 2 gebruikers niet weergegeven)
Regel 7: Regel 7:
|Name=Wesermarsch
|Name=Wesermarsch
|Start date=2016/10/01
|Start date=2016/10/01
|End date=2020/01/31
|End date=2020/07/31
|Summary=Improving and using risk and hazards maps to allow for contingency planning and exercises, with a special focus on rural and urban drainage. The improved database will be tested for improving resilience. Pilot Book attached for more detail.
|Summary=The overall goal is to strengthen layers 2 and 3 and providing the actors with useful  outcomes to get more balanced FRM strategies in the Wesermarsch region. The long term goal is to motivate and/or stimulate actors to continue with the same activities/line of work.
|Show summary=Nee
|Show summary=Nee
|Show navigation tree=Nee
|Show navigation tree=Ja
|Show new page button=Nee
|Show new page button=Ja
|Show sub projects=Nee
|Show sub projects=Nee
|Show participants=Nee
|Show participants=Nee
Regel 26: Regel 26:
|Country=Germany
|Country=Germany
|Coordinate=53.4030919, 8.4565113
|Coordinate=53.4030919, 8.4565113
|Objective=* Contingency planning workshops with regional stakeholders (layer 2 and 3)
|Pilot manager authority=Jade University of Applied Sciences
|Objective=* To increase public awareness and preparedness regarding floods to minimize subsequent damage
* To unveil shortcomings by reviewing mechanisms concerning disaster management from  individual preparations up to the request of national or international auxiliary forces
* To link stakeholders (governmental and non-governmental) which are involved in disaster management to share problems and ideas and interactively develop solutions / strategies
* To improve spatial planning / adaptation in terms of building flood resilience
|Flood risk=Riverine, rainfall and sea flooding.


* Contingency plan, spatial plan and exercises for flood prone areas
The flood hazard level is considered 1, not harmful.


* Smart linking of urban and rural drainage
In case of a storm surge with dike breaches, impacts are high (because area is low-lying and would be flooded quickly); in case of river or/and rainfall flooding the impacts are rather small scale / very localized.
|Target=1 - 89.000 inhabitants
|Target=1 - 89.000 inhabitants
2 - 20 regional fora
2 - 20 regional fora
}}
}}

Huidige versie van 7 mei 2020 om 13:17



}

























Country: Germany
Coordinate 53° 24' 11.13" N, 8° 27' 23.44" E
Pilot manager authority: Jade University of Applied Sciences
Objective:
  • To increase public awareness and preparedness regarding floods to minimize subsequent damage
  • To unveil shortcomings by reviewing mechanisms concerning disaster management from individual preparations up to the request of national or international auxiliary forces
  • To link stakeholders (governmental and non-governmental) which are involved in disaster management to share problems and ideas and interactively develop solutions / strategies
  • To improve spatial planning / adaptation in terms of building flood resilience
Flood risk: Riverine, rainfall and sea flooding.

The flood hazard level is considered 1, not harmful.

In case of a storm surge with dike breaches, impacts are high (because area is low-lying and would be flooded quickly); in case of river or/and rainfall flooding the impacts are rather small scale / very localized.

Stakeholder(s):
Bezig met het laden van de kaart...



Onderwerpen