| == 1. Pilot description ==
| |
|
| |
| === 1.1 Pilot manager authority ===
| |
|
| |
| === 1.2 Pilot location ===
| |
|
| |
| === 1.3 Area description ===
| |
|
| |
| === 1.4 Flood risks ===
| |
|
| |
| == 2. Pilot objective/goal ==
| |
|
| |
| == 3. Implementation process ==
| |
|
| |
| === 3.1 Point of departure of FRM strategies ===
| |
|
| |
| === 3.2 Key actors ===
| |
|
| |
| === 3.3 Main activities ===
| |
|
| |
| == 4. Project outcomes and beyond ==
| |
|
| |
| === 4.1 Main outcomes ===
| |
|
| |
| === 4.2 Key actors and their roles ===
| |
|
| |
| === 4.3 Flood risk management strategies (FRMS) ===
| |
|
| |
| === 4.4 Lessons learnt so far ===
| |
|
| |
| ==== · Knowledge needs for flood resilience: ====
| |
|
| |
| ==== · Related to content: ====
| |
|
| |
| ===== o ''Applying MLS approach'' =====
| |
|
| |
| ===== o ''Methods / techniques / tools applied to learn about vulnerabilities'' =====
| |
|
| |
| ===== o ''Methods / techniques to learn about impact on systems'' =====
| |
|
| |
| ===== o ''Methods / techniques community involvement'' =====
| |
|
| |
| ===== o Main uncertainties / challenges encountered =====
| |
|
| |
| ===== · Related to the decision making process of adaptive planning =====
| |
|
| |
| ===== o ''(structural) barriers encountered through the implementation process'' =====
| |
|
| |
| === 4.5 Dissemination and upscaling of pilot results ===
| |
|
| |
| === 4.6 Transnational exchange ===
| |
|
| |
| ==== · Protection ====
| |
|
| |
| ==== · Pro-action/prevention ====
| |
|
| |
| ==== · Preparedness & response ====
| |
|
| |
| ==== · Recovery ====
| |
|
| |
| == 5. References ==
| |
|
| |
|
| |
|
| |
|
| |
|
| {{Project FR PLT config}} | | {{Project FR PLT config}} |
Regel 69: |
Regel 5: |
| |Project type=FR PLT, FR WP, Standaard | | |Project type=FR PLT, FR WP, Standaard |
| |Topcontext=PR 00069 | | |Topcontext=PR 00069 |
| |Name=Alblasserwaard | | |Name=Alblasserwaard - Vijfheerenlanden |
| |Start date=2016/10/01 | | |Start date=2016/10/01 |
| |End date=2020/01/31 | | |End date=2020/07/31 |
| |Summary=Alblasserwaard-Vijfheerenlandenis an area in the province of Zuid Holland and lies between Rotterdam and Dordrecht. It is surrounded by six rivers; the Lek, the Merwede, the Noord, the Oude Zederik, Merwedekanaal and the Linge. The Alblasserwaard-Vijfheerenlanden is two metres below sea level. Traditionally, the emphasis was on layer 1. In this pilot, we will focus on layer 3: how can we in improve disaster management? We will prepare the area for the ‘what-if’-case. | | |Summary=Flood risk management strategies in the Netherlands focuses on flood prevention and less on the other layers of MLS. The responsibility for the different layers lies with different governments. Everyone takes their responsibility, but do we not miss opportunities by connecting the layers? |
| |Show summary=Nee | | |Show summary=Nee |
| |Show navigation tree=Nee | | |Show navigation tree=Ja |
| |Show new page button=Nee | | |Show new page button=Ja |
| |Show sub projects=Nee | | |Show sub projects=Nee |
| |Show participants=Nee | | |Show participants=Nee |
Regel 89: |
Regel 25: |
| {{Project FR PLT additional | | {{Project FR PLT additional |
| |Country=The Netherlands | | |Country=The Netherlands |
| |Coordinate=51.8617201, 4.658131 | | |Coordinate=51.873331, 4.800831 |
| |Pilot manager authority=Province of Zuid Holland | | |Pilot manager authority=Province of Zuid Holland |
| |Objective=* improvements of disaster management might have spatial implications (e.g. spatial obstacles might need to be removed for evacuation, etc.), which means there should be interaction between layers 2 and 3 | | |Objective=* A literature study will be carried out to create a shared view on MLS. This will also pinpoint any knowledge gaps in the different layers of MLS. |
| * how can citizens/ volunteer organizations play a role in emergency response, how to make use of social capital? | | * By combining evacuation (layer 3) with spatial development (layer 2), emergency management can be improved. |
| | * How can citizens / volunteer organizations play a role in emergency response? |
| |Flood risk=Riverine. | | |Flood risk=Riverine. |
|
| |
|
| The calculated risk for dike ring 16 is high compared to calculated flood risks for other dikerings in the Netherlands (VKN2, Dijkring 16) | | The Alblasserwaard-Vijfheerenlanden tilts from east to west and lies two meters below sea level. During flood event, water levels can rise 4 meters above elevation level. |
| |Target=1 - 300.000 inhabitants | | |Target=1 - 300.000 inhabitants |
| 2 - 10 communities | | 2 - 10 communities |
| }} | | }} |